Monday 28 January 2013

In the Frame

My production line of seats is taking far longer than I anticipated.  I now have one complete, or nearly complete crew seat and am working on the other 6 but progress is slow.

So, to progress, and since the update on my last post, I've butchered the floor former for the cabin.  That's involved removing the sides and front with the lock tabs for the cabin floor.  I've also cut new pieces to fit and secure the lowered floor.  Next stage is the reconstructive surgery to fit the new parts.

I've also made the first seat frame which will I think be for the crew seat on the port side at the rear of the cabin.  The two forward posts fit through the seats and are 3.2mm tube.  The tops are 4.0mm alloy tube and the side braces are 2.4mm brass.  I've used the RNLI plans for the frame size rather than the instructions.  All that's left is to finish the shock absorber on the centre seat back.

Here's a pic of the (nearly) finished seat.