I've been on hols for a week so less progress than usual and only one pic. However, I'm pleased with what I have done. The roof is now on the wheelhouse. A little filler was needed but I'm happy with the results. I still need to reinforce the inside joints. Rather than single 1mm thick strip, I'm going to use 0.5mm strip scored down the middle.
One holiday related link was that we went to see a Tamar. Turns out the port engine vent runs down below the flybridge floor; it's about twice as long as the kit part. So, I'm going to order some more styrene from Squires and build an alternative flybridge floor and see if I can model it with the larger vent. If not, the kit parts are in reserve. More on that next time hopefully.
No comments:
Post a Comment