Wednesday, 21 September 2011

It's all in the detail - pt2

So, it's time to run through the next batch of modifications I made


9 - added a small box in front of vents 5 and 6 on the wheelhouse side
10 - put domes inside the vent boxes.  These are just rubber feet sprayed gloss white
11 - added the sockets on the wheelhouse sides by the side steps
12 - added the conduit for the whip aerial leads
13 - changed the aerial arrangement on the mast and added new aerials

and inside the wheelhouse
14 - added the bars inside the front windows
15 - scratch built the switch panel by the radio operator and added handsets on the radio panel
16 - put seat belts on all crew seats and
17 - modified the grab rails

Next time, I'll finish off by looking at the stern and by then, hopefully the carrying box will be finished.

No comments:

Post a Comment